Commit Graph
3 Commits
Author SHA1 Message Date
Algis DumbrisandClaude Opus 4.7 89aaa51f71 tasks(019): 103-task execution plan organized by user story
Setup (3) + Foundational (15) + US4 backup (5) + US1 toggle (5) +
US3 wiki extraction (12) + US5 failure isolation (4) + US2 author docs (6) +
Verification (9) + Polish (5).

MVP = Setup + Foundational + US3 + US1.
Parallel opportunities marked [P] within each story.
All tasks follow checklist format with concrete file paths.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-19 06:58:46 +03:00
Algis DumbrisandClaude Opus 4.7 69cd13dce1 plan(019): plugin system plan + research + data-model + contracts + quickstart
Phase 0 research resolves all 12 open decisions (interface shape, registration,
host API, dynamic toggle, migrations, UI panel integration, config format,
testing, boundary enforcement, squash, failure notification, integration test).

Phase 1 artifacts: data-model.md (Plugin, Registry, Migration, Host, Status,
Backup), contracts/plugin.md (Plugin + HasX interfaces), contracts/host.md
(Host struct + plugintest constructor), contracts/rest.md (/api/plugins/*),
quickstart.md (end-to-end "hello" plugin in 8 steps).

All ten constitution gates pass.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-19 06:56:36 +03:00
Algis DumbrisandClaude Opus 4.7 b021768a9a spec(019): plugin system for SynapBus core
Compile-in plugin framework with tiny Plugin interface + HasX capability
sub-interfaces, typed Host struct, explicit registration, SIGHUP graceful
restart, three-phase boot, per-plugin failure isolation, plugintest helpers.

Scope: Phase 0 backup+squash, Phase 1 framework plumbing, Phase 2 extract
wiki as canonical pilot plugin. Remaining 9 extractions are follow-up.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-19 06:52:38 +03:00